Paul Jackson is a Fellow of the RICS with a wealth of experience of sales and valuations of all types of property, as well as residential development, land, acquisition and disposal. Offering a personal service with professional coverage of West Midlands and Worcestershire areas. |
Please Note: These Standard Terms of Engagement form
part of the contract between the Surveyor and the Client.
A modified form of Homebuyer Survey & Valuation Service applies in
Scotland.
General
1 The Service. The standard HOMEBUYER Survey & Valuation Service
(“the Service”) which is described in Part 2 of these Terms (“the
Description”) applies unless an addition to the Service is agreed in
writing before the Inspection. (An example of such an addition is
reporting upon parts which are not normally inspected, such as the
opening of all windows.)
2 The Surveyor who provides the Service will be a Chartered
Surveyor, or a Fellow or Associate of the Incorporated Society of
Valuers and Auctioneers, who is competent to survey, value and
report upon the Property which is the subject of these Terms.
3 Before the Inspection. The Client will inform the Surveyor of the
agreed price for the Property and of any particular concerns (such
as plans of extension) which he or she may have about the Property.
4 Terms of Payment. The Client agrees to pay the fee and any other
charges agreed in writing.
5 Cancellation. The Client will be entitled to cancel this contract
by notifying the Surveyor’s office at any time before the day of the
Inspection. The Surveyor will be entitled not to proceed with the
provision of the Service (and will so report promptly to the Client)
if, after arriving at the Property, he or she notes:
a) that is of a type of construction of which he or she has
insufficient specialist knowledge to be able to provide the Service
satisfactorily, or
b) that it would be in a typical Client’s best interests to be
provided with a Building Survey, plus valuation, rather than the
HOMEBUYER Service.
In the case of cancellation, the Surveyor will refund any money paid
by the Client for the Service, except for expenses reasonably
incurred. In the case of cancellation by the Surveyor, the reason
will be explained to the Client.
6 Liability. The Report provided is solely for the use of the Client
and the Client’s professional advisers, and no liability to anyone
else is accepted. Should the Client not act upon specific,
reasonable advice contained in the Report, no responsibility is
accepted for the consequences.
7 Complaints Handling Procedure. A copy of the firm’s complaints
handling procedure us available on request.
A The Service
A1 The HOMEBUYER Service comprises:
• an Inspection of the Property (Section B below)
• a concise report based on the Inspection (Section C)
• the Valuation, which is part of the Report (Section D)
A2 The Surveyor’s main objective in the HOMEBUYER Service is to give
Clients considering buying a particular Property the professional
advice which will assist them:
• to make a reasoned and informed judgement on whether or not to
proceed with the purchase
• to assess whether or not the Property is a reasonable purchase at
the agreed price
• to be clear what decisions and actions should be taken before
contracts are changed
A3 The HOMEBUYER Service therefore covers the general conditions of
the Property and particular features which affect its present value
and may affect its future resale. The Report focuses on what the
Surveyor judges to be urgent or significant matters. Significant
matters are those which, typically, in negotiations over price would
be reflected in the amount finally agreed.
B The Inspection
B1 The Inspection is a general surface examination of those parts of
the Property which are accessible: in other words, visible and
readily available for examination from ground and floor levels,
without the risk of causing damage to the Property of injury to the
Surveyor. Due care is therefore exercised throughout the inspection
regarding safety, practicality and the constraints of being a
visitor to the Property (which may be occupied). So furniture, floor
coverings and other contents are not moved or lifted; and no part is
forced or laid open to make it accessible.
B2 The services are inspected (except in the case of flats, for
drainage, lifts and security systems), but the Surveyor does not
test or assess the efficiency of electrical, gas, plumbing, heating
or drainage installations, or compliance with current regulations,
or the internal condition of any chimney, boiler of flue. Also, the
Surveyor does not research the presence (or possible consequences)
of contamination by any harmful substance. However, if a problem is
suspected in any of these areas, advice is given on what action
should be taken.
B3 Where necessary, parts of the Inspection are made from adjoining
public property. Such equipment as a damp-meter, binoculars and a
torch may be used. A ladder is used for hatches and also for flat
roofs not more than three metres above ground level. Leisure
facilities and non-permanent outbuildings (such as pools and timber
sheds) are noted but not examined. In the case of flats, exterior
surfaces of the building containing the Property, as well as its
access areas, are examined in order to assess their general
condition; roof spaces are inspected if there is a hatch within the
flat.
C The Report
C1 The Report provides the Surveyor’s opinion of those matters which
are urgent or significant and need action or evaluation by the
Client before contracts are exchanged. It includes some or all of
the following:
• urgent repairs (e.g. gas leak; defective chimney stacks) – for
which the Client should obtain quotations where appropriate
• significant matters requiring further investigation where
essential (e.g. suspected subsidence) – for which the Client should
obtain (and may have to pay for) reports and quotations from
suitable contractors
• significant but not urgent repairs and renewals (e.g. new covering
for flat roof before long)
• other significant considerations (e.g. some potential source of
inconvenience) which the surveyor wishes to draw to the attention of
the Client
• legal matters (e.g. a possible right of way) which the Client
should instruct the Legal Advisers to include in their enquiries.
C2 Matters assessed as not urgent or not significant are outside the
scope of the HOMEBUYER Service and are generally not reported;
however, other matters (such as safety) are reported where the
Surveyor judges this to be helpful and constructive. If a part or
area normally examined is found to be not accessible during the
Inspection, this is reported; if a problem is suspected, advice is
given on what action should be taken.
C3 The Report is in a standard format arranged in the following
sequence: Introduction and Overall Opinion; The Property and
Location; The Building; The Services & Site; Legal & Other Matters;
Summary; Valuation. In the case of leaseholds, the Report is
accompanied by a standard appendix called Leasehold Properties.
D The Valuation and Reinstatement Cost
D1 The last section of the Report contains the Surveyor’s opinion
both of the Market Value of the Property and of the Reinstatement
Cost, as defined below.
D2 “Market Value” is the estimated amount for which a property
should exchange on the date of valuation between a willing buyer and
a willing seller in an arm’s length transaction after proper
marketing wherein the parties had each acted knowledgeably,
prudently and without compulsion. In arriving at the opinion of the
Market Value, the Surveyor also make various standard assumptions
covering for example vacant possession; tenure and other legal
considerations; contamination and hazardous materials; the condition
of uninspected parts; the right to use mains services; and the
exclusion of curtains, carpets, etc., from the valuation. (If
required, details are available from the Surveyor). Any additional
assumption, or any found not to apply, is reported.
D3 “Reinstatement Cost” is an estimate for insurance purposes of the
current cost of rebuilding the Property in its present form, unless
otherwise stated. This includes the cost of rebuilding the garage
and permanent outbuildings, site clearance and professional fees,
but excludes VAT (except on fees).
Click here to return to the home page.